卡通动漫第一页久久 国内国外内射免费视频 精品爆乳一区二区三区 91嫩草久久

To provide customers with systematic
and intelligent water treatment solutions
Current location: Home Page > News > Industry Trends
What necessary investigations should be made before
Time:2021-07-08 10:01:49
Article release:Admin
Original author:Unknown
Source:Internet

What necessary investigations should be made before screening corrosion and scale inhibitors


As we all know, corrosion inhibitor is a kind of substance added to water that can interfere with the electrochemical action of corrosion and can prevent or reduce the corrosion rate of metal. Before using experimental verification, we should master the actual situation on the site and conduct a comprehensive investigation on the circulating cooling water system to be processed. This is also an important basis for Ande technology to choose recycled water agents. The specific methods are summarized as follows:




(1) Water quality




(1) Understand the source water is surface water or groundwater, whether it is polluted. Groundwater shall be analyzed quarterly for not less than one year. If there are several Wells, the water quality of each well should be known. For surface water, complete monthly analysis data of not less than one year should be collected.




(2) Supplement water quality to understand whether the raw water, after pretreatment and pretreatment methods, the use of flocculant or coagulant varieties. Full monthly water quality analysis data of not less than one year shall be collected. '




(3) water quality of circulating cooling




If the circulation system has been in operation, the on-site circulating water quality data can be directly used as the basis for selecting the formula. However, data should be selected when the concentration multiple is stable, at least monthly data for a year. The data at natural pH values should be known as far as possible. '-




(2) Design data of circulating cooling water system




Need to understand the type of cooling tower, circulating water FFI (m3/h), the system 'volume V (m3), the design of inlet and outlet tower water temperature (°C). It is also necessary to know the concentration multiple possible for the system and the effluent B(m3/h), wind-blown loss D(MVh) and replenishment M(m3/h) at the operating multiple. And understand the annual temperature, humidity and water temperature trends. ,




The average residence time of the agent in the system, T[V7(B+D)], should not exceed 50h in order to prevent the agent from decomposing or precipitating from hydrolysis.




(3) Data and process characteristics of the water cooler




Need to understand all the data of water treatment cooler, including the number, model, structure, material, thermal strength, process medium inlet and outlet water temperature, water flow rate and other issues.




(4) Understand the surrounding discharge environment and air pollution, understand the environment of the area through which sewage flows after discharge, whether there are agricultural crops, aquatic crops and the final discharge water area, etc., all of which will affect the stability of the circulating water system.



Label:
汾西县| 靖宇县| 平乐县| 哈密市| 东丽区| 秦皇岛市| 大城县| 杭州市| 泗水县| 平顺县| 麦盖提县| 甘孜县| 潜山县| 铜鼓县| 海门市| 布尔津县| 新田县| 吉木乃县| 南部县| 乡宁县| 潞西市| 宝山区| 通渭县| 抚顺县| 偃师市| 中卫市| 绍兴县| 新兴县| 贵德县| 喀喇沁旗| 桃源县| 凯里市| 叶城县| 安图县| 长垣县| 湘阴县| 道孚县| 隆安县| 简阳市| 美姑县| 于田县|